Internal MSC routing slips, leaked to this paper by a patriot at Mission Control, confirm what KFD has been screaming for two months: the so-called "Basic Station" was assembled with a docking port that did not match the spec KerbalX themselves submitted.
They sent Valentina up there to find out. Then they decommissioned the evidence.
FRAME 0119 · R-SLS2 EVA HELMETCAM material reviewed by this paper shows crosshair measurement consistent with a port mismatch on the order of millimeters — not rounding error, not thermal drift, not "within tolerance" if you squint.
KerbalX and MSC public affairs issued harmonized statements calling MSC-002 a "successful EVA demonstration with attached station program review." KFD calls that what it is: a sentence written by lawyers who hope you do not read specifications for a living.